SPC BRIDGE CONSTRUCTION METHOD
老挝专利「SPC BRIDGE CONSTRUCTION METHOD」是 DIP 公开可查的知识产权档案,由 KUROSAWA CONSTRUCTION CO., LTD 于 2013-09-09 提交申请,当前状态为已放弃。公开档案中可核验:申请号 P/276,DIP 编号 LAP276,主管局代码 LA,保护类型 Patent - Foreign。时间线要点:公开/公告日 2026-01-16。技术或外观分类记载为 E02D 27/34。发明人 / 设计人包括 Kei HIRAI、Ryohei KUROSAWA。代理机构 / 代理人记载为 Lao Interconsult Co., Ltd。公开摘要提示:An SPC bridge construction method including: overhanging an intemal steel member arranged in the bridge supporting base portion by a requir…。
This Laos patent “SPC BRIDGE CONSTRUCTION METHOD” is a public DIP intellectual-property record, filed by KUROSAWA CONSTRUCTION CO., LTD on 2013-09-09; current status: Abandoned. Identifiers include application No. P/276; DIP id LAP276; protection kind Patent - Foreign. Key dates: publication 2026-01-16. Classification: E02D 27/34. Inventor(s)/designer(s): Kei HIRAI, Ryohei KUROSAWA. Abstract hint: An SPC bridge construction method including: overhanging an intemal steel member arranged in the bridge supporting base portion by a requir…. Status labels may change after office actions; refresh or consult primary DIP data before commercial decisions.
ໜ້ານີ້ສະຫຼຸບ ສິດທິບັດ «SPC BRIDGE CONSTRUCTION METHOD» ຈາກຂໍ້ມູນຈົດທະບຽນເປີດ, ຍື່ນໂດຍ KUROSAWA CONSTRUCTION CO., LTD ໃນວັນທີ 2013-09-09; ສະຖານະ ປະຖິ້ມ. ຕົວລະບຸ: ເລກທີຄຳຮ້ອງ P/276; ລະຫັດ DIP LAP276; ປະເພດການປົກປ້ອງ Patent - Foreign. ວັນທີສຳຄັນ: ວັນເຜີຍແຜ່ 2026-01-16. ປະເພດ/ຫ້ອງ: E02D 27/34. ນັກປະດິດ/ນັກອອກແບບ: Kei HIRAI, Ryohei KUROSAWA. ສະຫຼຸບ: An SPC bridge construction method including: overhanging an intemal steel member arranged in the bridge supporting base portion by a requir…. ໃຊ້ LaoBiz ເພື່ອເບິ່ງ IP ອື່ນຂອງຜູ້ຍື່ນຄົນດຽວ ຫຼື ໜ້າວິສາຫະກິດທີ່ກ່ຽວຂ້ອງ.
P/276
图样
基础信息
- 类型
- 专利
- 申请号
P/276- 状态
- 已放弃
- 申请人
- KUROSAWA CONSTRUCTION CO., LTD
- 代理机构
- Lao Interconsult Co., Ltd
- 申请日期
- 2013-09-09
- 公开/公告日
- 2026-01-16
- 国际分类
- E02D 27/34
- 商品 / 服务
- —
办理流程
根据当前状态动态标注-
提交申请
-
形式审查 进行中
-
实质审查
-
公开
-
授权
关联分析
LaoBiz 企业数据库联动类似专利推荐
摘要
An SPC bridge construction method including: overhanging an intemal steel member arranged in the bridge supporting base portion by a required length on a subsequent overhanging bridge body block side, coupling one end side of the intemal steel member of a subsequent block to the projecting end, causing a distal end on the other end side to project from the overhanging bridge body by a required length, mounting an adjustment hanging member from the movable service vehicle to the projecting distal end and adjusting a distal end level by using a nut, coupling the one end side of the intemal steel member to the projecting distal end of the previous block, causing the distal end on the other end side to projecting by a required length, constructing the block while adjusting the distal end level, and repeating the same procedure for the respective blocks from the next onward in sequence.
An SPC bridge construction method including: overhanging an intemal steel member arranged in the bridge supporting base portion by a required length on a subsequent overhanging bridge body block side, coupling one end side of the intemal steel member of a subsequent block to the projecting end, causing a distal end on the other end side to project from the overhanging bridge body by a required length, mounting an adjustment hanging member from the movable service vehicle to the projecting distal end and adjusting a distal end level by using a nut, coupling the one end side of the intemal steel member to the projecting distal end of the previous block, causing the distal end on the other end side to projecting by a required length, constructing the block while adjusting the distal end level, and repeating the same procedure for the respective blocks from the next onward in sequence.