专利 已放弃

SPC BRIDGE CONSTRUCTION METHOD

Overview

老挝专利「SPC BRIDGE CONSTRUCTION METHOD」是 DIP 公开可查的知识产权档案,由 KUROSAWA CONSTRUCTION CO., LTD 于 2013-09-09 提交申请,当前状态为已放弃。公开档案中可核验:申请号 P/276,DIP 编号 LAP276,主管局代码 LA,保护类型 Patent - Foreign。时间线要点:公开/公告日 2026-01-16。技术或外观分类记载为 E02D 27/34。发明人 / 设计人包括 Kei HIRAI、Ryohei KUROSAWA。代理机构 / 代理人记载为 Lao Interconsult Co., Ltd。公开摘要提示:An SPC bridge construction method including: overhanging an intemal steel member arranged in the bridge supporting base portion by a requir…。

专利 老挝 DIP

申请号 P/276
申请日期 2013-09-09
申请人 KUROSAWA CONSTRUCTION CO., LTD
代理机构 Lao Interconsult Co., Ltd
类别 E02D 27/34

图样

下载

基础信息

类型
专利
申请号
P/276
状态
已放弃
申请人
KUROSAWA CONSTRUCTION CO., LTD
代理机构
Lao Interconsult Co., Ltd
申请日期
2013-09-09
公开/公告日
2026-01-16
国际分类
E02D 27/34
商品 / 服务

办理流程

根据当前状态动态标注
  1. 提交申请
  2. 形式审查 进行中
  3. 实质审查
  4. 公开
  5. 授权

关联分析

LaoBiz 企业数据库联动

摘要

An SPC bridge construction method including: overhanging an intemal steel member arranged in the bridge supporting base portion by a required length on a subsequent overhanging bridge body block side, coupling one end side of the intemal steel member of a subsequent block to the projecting end, causing a distal end on the other end side to project from the overhanging bridge body by a required length, mounting an adjustment hanging member from the movable service vehicle to the projecting distal end and adjusting a distal end level by using a nut, coupling the one end side of the intemal steel member to the projecting distal end of the previous block, causing the distal end on the other end side to projecting by a required length, constructing the block while adjusting the distal end level, and repeating the same procedure for the respective blocks from the next onward in sequence.

An SPC bridge construction method including: overhanging an intemal steel member arranged in the bridge supporting base portion by a required length on a subsequent overhanging bridge body block side, coupling one end side of the intemal steel member of a subsequent block to the projecting end, causing a distal end on the other end side to project from the overhanging bridge body by a required length, mounting an adjustment hanging member from the movable service vehicle to the projecting distal end and adjusting a distal end level by using a nut, coupling the one end side of the intemal steel member to the projecting distal end of the previous block, causing the distal end on the other end side to projecting by a required length, constructing the block while adjusting the distal end level, and repeating the same procedure for the respective blocks from the next onward in sequence.

提交咨询

留下联系方式,顾问将在工作时间内回复。

联系方式 * 点选后填写 · 至少一种
验证码 *
验证码

登录 LaoBiz

使用注册邮箱登录您的账号

或使用

使用 Google 登录

还没有账号?

或使用

使用 Google 注册

已有账号?

该社交账号未提供邮箱,请填写常用邮箱并完成验证后即可登录。