ໃບອະນຸຍາດປຸກສ້າງ
Construction Permit
施工许可
Individual or legal entity intends to construct the building or other construction which comprise of: 1. Construction and Installation; 2. Expansion and Changes in usage goal; 3. Restoration and Renovation; 4. Demolish and Restoration
ຜູ້ທີ່ຕ້ອງການ
Individual or legal entity intends to construct the building or other construction which comprise of: 1. Construction and Installation; 2. Expansion and Changes in usage goal; 3. Restoration and Renovation; 4. Demolish and Restoration
ເງື່ອນໄຂ
- 建筑设计须符合技术标准,并遵守城市规划图及相关规定,包括总体规划、分区图、特定用地规定,以及城市与建设管理、建筑保护、环境等规定。
- 须持有土地证。
- 享有土地使用权但土地发证项目尚未覆盖该地的,由主管机关个案审议。
ເອກະສານຄັ້ງທຳອິດ
| ເອກະສານ | ໝາຍເຫດ |
|---|---|
| ໃບຕາດິນ | prepare 3 copies in the size of F14 |
| ສຳເນົາບັດປະຈຳຕົວ | or Family Registration Book or Passport (for foreigner) |
| ແບບແຜນຜັງໂຄງການ | including the Diagram of the Aerial View of the location (ratio 1/5000), the Overall Diagram, the Diagram on Land Management, Sections compared to the land size, Diagram of the Drainage System, Diagram of Wastewater Treatment Plan, Architecture Model, Building Plam and other related systems |
| ແບບແຜນຜັງໂຄງການທີ່ໄດ້ຜ່ານການຢັ້ງຢືນ | from a Housing Construction (Survey-Design) Company that has a Business Operating License |
| ໃບສະເໝີ |
ກົດໝາຍທີ່ກ່ຽວຂ້ອງ
- ກົດໝາຍວ່າດ້ວຍ ຜັງເມືອງ (ສະບັບປັງປຸງ)
- ກົດໝາຍວ່າດ້ວຍ ການກໍ່ສ້າງ
- ຂໍ້ຕົກລົງກ່ຽວກັບ ການຄຸ້ມຄອງການປຸກສ້າງ
ການຍື່ນເອກະສານ
- ວິທີຍື່ນ
- ຢູ່ທີ່ຫ້ອງການເຈົ້າຫນ້າທີ່
- ທີ່ຢູ່ໜ່ວຍງານ
- ພະແນກໂຍທາທິການ ແລະ ຂົນສົ່ງ, ນະຄອນຫຼວງວຽງຈັນ
- ໄລຍະດຳເນີນ
- 45 After receiving the application, the authority will inspect the construction site and in case the design is incorrect or some documents are not detailed or not meet the standard, the Construction Management Organization will inform the applicant within 7 days, if the application is completed [the authority] will issue the permit not more than 30 days from receiving of application.
ອາຍຸ ແລະ ການຕໍ່ອາຍຸ
- ມີກຳນົດອາຍຸ
- ມີ
- ຂັ້ນຕອນຕໍ່ອາຍຸ
- ໃບອະນຸຍາດມີຜົນໃຊ້ໄດ້ພາຍໃນກໍານົດເວລາ 6 ເດືອນນັບແຕ່ມື້ລົງລາຍເຊັນເປັນຕົ້ນໄປ. ກໍລະນີບໍ່ໄດ້ລົງມືປຸກສ້າງຕາມກໍານົດເວລາດັ່ງກ່າວ, ຜູ້ຂໍອະນຸຍາດສາມາດຕໍ່ອາຍຸນໍາໃຊ້ຕື່ມອີກ 1 ຄັ້ງ. ຖ້າເກີນກໍານົດມື້ໃບອະນຸຍາດທີ່ອອກໃຫ້ແລ້ວແມ່ນໃບອະນຸຍາດຈະບໍ່ສາມາດນຳໃຊ້ໄດ້.
ຄຳເຫັນເພີ່ມເຕີມ
1. Provincial Governor Administrative Office/Vientiane Capital is the authority to give approval on building level 1 which comprise of a big building with an area of 10,000 square meters, the height is more than 20 meters, it is a controlled building, Industry and Handicraft Factory Plant level 3 and 2, the construction with environmental impact. 2. The Department of Public Works and Transport of provincial is the authority to give approval on building level 2 which comprise of the medium building with an area of 400 to 10,000 square meters, the height is more than 10 to 20 meters, fuel station in all level, Industry, and Handicraft Factory Plant level 1, construction with environmental impact, telecommunication and communication tower systems, large power pole, large billboard (all types of LED, roadside signage size 2x4 meters and over). 3. Office of Public Works and Transport is the authority to give approval on building construction level 3 which comprise of a small building for a resident with an area, not more than 400 square meters, the height is not more than 10 meters, and small roadside signage (not more than 2x4 meters). The relevant authority will inspect the building that they have granted the approval at least 2 times before the completion of the building. After the building is completed the applicant must notify the authority not later than 15 days in order to have a final inspection and issue the accuracy certificate as evidence until such building is changed.